Skip to main content

Jonkin Silicon

Inspection & Packaging

Inspection & Packaging

Product Identification

Verify product model, quantity and batch identification.

Appearance & Dimensions

Check appearance, edge condition and critical drawing dimensions.

Material Properties

Confirm electrical properties and other requirements in the technical agreement.

Inspection Documents

Verify the accompanying inspection report and batch information.

Packaging, Storage & Transport

Clean Handling

Wear cleanroom gloves and a mask. Avoid touching machined surfaces with bare hands. Clean, dry and protect products before packaging.

Transport Protection

Secure products with cushioning to prevent vibration, impact and packaging damage. Do not transport together with oily or corrosive chemicals.

Storage & Use Conditions

18–26℃

Storage temperature

40–60%RH

Relative humidity

12 months

Unopened shelf life

30 days

Recommended installation after opening

Store sealed in vacuum PE bags in a clean environment, away from direct sunlight and dust.

Conditions are taken from the product guide. Applicable conditions and starting dates are governed by the product label and accompanying documents.

Installation & Maintenance

01

Pre-installation Checks

Check identification, drawing revision, dimensions and locating holes. Confirm fit and clean sealing contact surfaces.

02

Control Assembly Stress

Apply the equipment-specified tightening torque and support the part during handling to prevent fractures caused by local stress.

03

Equipment Process Validation

Perform pre-etching, particle baseline calibration and wafer trials as required by the equipment. Begin production after acceptance criteria are met.

04

Periodic Inspection & Replacement

Record thickness, corrosion and wear. Stop and inspect according to procedure when replacement limits are reached or cracks appear.

Technical Consultation & Custom Requirements

Please provide the product form, drawings, conductivity type, resistivity and delivery requirements.